Tower Crane Dismantling: Method Statement

This is not a checklist. It is a binding choreography of physics, logistics, and human discipline.

| Name | Role | Signature | Date | |------|------|-----------|------| | [Name] | Appointed Person | | | | [Name] | Site Manager | | | | [Name] | Safety Officer | | | tower crane dismantling method statement

Note: Provide a detailed engineered lift plan with load calculations for each lift, crane charts and rigging arrangement for every critical lift — attach as appendices. This is not a checklist

The assist crane takes the tension of the first counter-weight. Riggers remove the retaining pins. The assist crane takes the tension of the

Responsible for the lift plan and overall safety. Crane Supervisor: Manages the dismantling team on-site.

Dismantling must stop if wind speeds exceed specific limits (typically 25 km/h or 14 m/s ).